Camping in the heart of the Guadalest Valley

Nature, tranquility, and unforgettable trails await you

Book now

Welcome to the "Benimantell" camping!

The campsite will be located in the heart of the Guadalest Valley, a natural and cultural oasis in the province of Alicante.

Campsite facilities

  • More than forty pitches for motorhomes and several bungalows
  • A large swimming pool with a spacious relaxation area
  • A modern gym
  • Spacious and comfortable showers
  • A bar-restaurant with a capacity for 48 people
  • A small supermarket with all essentials
  • A playground for children
  • Green areas with picnic pavilions
Campsite map
Campsite map

Location and surroundings

Within walking distance of the campsite are two villages: Benimantell and Guadalest, where you will find numerous museums, traditional cuisine restaurants, and viewpoints.

From the campsite, about 20 trails equipped with signage throughout their length start, leading to the most beautiful and accessible places in the Guadalest Valley, with breathtaking panoramic views stretching for dozens of kilometers.

The campsite is located on the outskirts of the village of Benimantell, next to the sports complex. The most convenient way to reach the campsite is to exit the CV-70 road onto a paved road that begins 50 meters west of the village outskirts.

View from the campsite
From any point in the campsite, there is a stunning view of the mountain ranges surrounding the Guadalest Valley.

The perfect place to rest

Here, where history and nature merge, you will find the ideal place to relax at any time of the year. Follow the site’s updates to stay informed about the project's development and the campsite’s opening!

Project progress

We planned to start the works at the end of 2024 and open the campsite in spring 2025, but it is now evident that this is unrealistic.

November 5, 2024

FINALLY! We can continue the work!

We already have the Urban Compatibility Certificate. This is a document we have been waiting for exactly 8 months, since March 5.

November 29, 2024

We are pleased to announce that the Benimantell City Hall is making every effort to ensure the timely and proper implementation of the project. We are fully aware of the magnitude and complexity of the administrative work carried out by the City Hall employees, and we sincerely thank them for their dedication to the development and prosperity of the entire municipality. Their professionalism and commitment to excellence provide reliable support in achieving common goals.

December 22, 2024

On the campsite grounds, leveling works are in full swing. We have started building retaining walls of natural stone around the entire perimeter of the campsite and within its grounds.

January 3, 2025

The Benimantell Town Hall denied us a temporary connection to the water supply network, which we had requested to carry out the construction of retaining walls made of stone. They argued that, in their opinion, water is not needed for building such walls and that the masonry should be done using only stone, without any construction mortar.

January 7, 2025

Today we were informed by phone that we will finally be connected to the water supply and will be able to rebuild the ruined terrace walls using mortar, in accordance with construction standards.

The water connection will also allow our gardener to begin landscaping work. 

March 12, 2025

Contract with ECUV to speed up the licensing process

On March 12, we signed a contract with ECUV – Cercontrol, an officially accredited Entidad Colaboradora Urbanística de la Comunitat Valenciana.

ECUV specializes in the technical certification of urban planning projects, expediting the licensing process through detailed analysis and prior coordination with regulatory authorities.

As part of this collaboration, Cercontrol will conduct a comprehensive review of the camping project and prepare the sectoral reports required for obtaining the construction license.

This will significantly reduce administrative processing times and increase transparency in the approval process.

March 25, 2025

Since March 24, we have significantly increased the pace of construction of the retaining walls. The work is being carried out simultaneously in three areas.